La Entrada - Santa Rosa de Copán. Km152

비탈면 보강 시스템 - La Entrada - Santa Rosa de Copán. Km152 2019

Road after the installation of the protective mesh with preinstalled erosion control mat

비탈면 보강 시스템 - La Entrada - Santa Rosa de Copán. Km152 2019

Installation of the spike plates

비탈면 보강 시스템 - La Entrada - Santa Rosa de Copán. Km152 2019

Slope stabilized with TECCO® GREEN G65/3

 

Year of installation

2019

Situation

Large blocks were likely to fall from the erosional layer at the bottom of the rockface.

Geology

Top layer: fractured rock
Bottom: soil

Description

To stabilize the blocks and to control the erosion on the lower layer TECCO® GREEN mesh with 6 m nails, a pattern of 2.3 x 2.3 m was installed.

Customer

BCIE

Contractor

Gabriel Couto

Protected object

Road

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

ACI

Subcontractor

ICA Inversiones

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 미국 Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 미국 Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

자연 재해
유압 공학
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 미국 Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 미국 Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

자연 재해
Geobrugg North America, LLC,Salem OR 97302 / 미국 Sales Director

E-Mail