Stabilizarea pantelor - Zion Hill 2015

TECCO® SYSTEM3 after all protection works are finished.

Stabilizarea pantelor - Zion Hill 2015

Installed TECCO® SYSTEM3.

Stabilizarea pantelor - Zion Hill 2015

TECCO® G65/3 rolls during installation.

Stabilizarea pantelor - Zion Hill 2015

Slope nails installation using portable, suspended drill rig. For extra protection drilling works were executed through TECCO® G65/3 mesh.

 
 

Anul instalării

2015

Situația inițială

Rockfall from the channel wings meant risk for the channel workers.

Descriere

Slope stabilization with TECCO® SYSTEM3 mesh and anchors with 32 mm diameter every 2.5 m.

Client

Autoridad del Canal de Panamá - ACP

Antreprenor

Alvarado & Düring International

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Tehnologie

Autoridad del Canal de Panamá - ACP

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail