Zagreb-Rijeka Railway Line - Tunnel Meja

Stabilizarea pantelor - Zagreb-Rijeka Railway Line - Tunnel Meja 2017

Installation of the high tensile TECCO® G65/4 mesh on the slope - visible nail pattern and TECCO® SYSTEM³ spike plates

Stabilizarea pantelor - Zagreb-Rijeka Railway Line - Tunnel Meja 2017

Overview of the construction site - on the right the old solution with visible gabion mesh which turned out to be not sufficient for the conditions. TECCO® SYSTEM³ was designed to be placed over the old layer of mesh

Stabilizarea pantelor - Zagreb-Rijeka Railway Line - Tunnel Meja 2017

Drilling works were executed through the old layer of gabion mesh being already strongly fatigued

Stabilizarea pantelor - Zagreb-Rijeka Railway Line - Tunnel Meja 2017

TECCO® SYSTEM³ protecting slope - visible the pre-tensioning on some nails which allows following the morphology very tight

Stabilizarea pantelor - Zagreb-Rijeka Railway Line - Tunnel Meja 2017

TECCO® SYSTEM³ protecting slope along the railway line directly next to the Meja Tunnel

 
 

Anul instalării

2017

Situația inițială

The revision works at the railway line no. M202 Zagreb-Rijeka were done together with the installation of a slope protection system. In the past, regularly occurring rock falls limited the speed of the trains.

Geologie

Limestones covered by scree

Descriere

When designer Vanja Kovačević received data from the geologist, he chose TECCO® G65/4 for this slope protection. TECCO® G65/4 was combined with 4 meters long self-drilling nails (32/21 mm) and 6 to 14 meters long nails (51/34.3 mm).

This is the first TECCO® G65/4 installation in Croatia.

Client

Croatian Railway

Antreprenor

Swietelsky d.o.o. Zagreb

Obiect protejat

Calea ferata

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Tehnologie

Elektroprojekt d.d. Zagreb (Krešo Ivandić and Vanja Kovačević)

Alte companii implicate

Octopus-Rijeka d.o.o. Rijeka

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail