Statele Unite
Statele Unite

myGeobrugg

Trek route to Shri Mata Vaishno Devi Shrine (2)

Stabilizarea pantelor - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

TECCO® SYSTEM³ and TECMAT® anti-erosion mat after installation and greening

Stabilizarea pantelor - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Target of all pilgrims - famous Holy Shrine of Shri Mata Vaishno Devi

Stabilizarea pantelor - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Scenic route to the Holy Shrine of Shri Mata Vaishno Devi - originally protected with simple canopies

Stabilizarea pantelor - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Rockfalls were quite eminent and the are for sure required extra safety measures

Stabilizarea pantelor - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

QUAROX® with DELTAX® secondary mesh (also called QUAROX® PLUS) installation in progress

Stabilizarea pantelor - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Unrolling of QUAROX® high tensile net on the slope

Stabilizarea pantelor - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Nail drilling works in progress - for extra safety reasons, all the works were implemented through previously unrolled QUAROX® high tensile net

Stabilizarea pantelor - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Together with active slope stabilization also many rockfall barriers were installed - here visible GBE-3000A type for 3000 kJ

Stabilizarea pantelor - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

TECCO® SYSTEM³ and TECMAT® anti-erosion mat after installation and greening

 

Anul instalării

2016

Situația inițială

There had been several cases of rockfall and landslides in the trek route of the Holy Shrine of Mata Vaishno Devi. Therefore, the Shrine Board decided to actively stabilize the 75º and higher steep slope, up to a maximum height of 70 m in this section. A protective measure had to be selected to stabilize the exposed cutting against superficial instabilities, tilting as well as sliding of individual blocks and rockfalls.

Descriere

The flexible slope stabilization system consists of TECCO® G65/3 high-tensile steel wire mesh and QUAROX® rolled cable net, system spike plates and soil nails has been selected. Spike plates which match the load capacity of the mesh serve to fix the mesh to soil or rock nails. By tensioning these nails, and recessing the spike plates into the ground, the mesh is adequately tensioned to ensure it follows the surface contours.

Based on the survey results, the authorities also decided to apply a rockfall protection barriers from Geobrugg. With its ring nets made of high-tensile steel wire the barrier design has been tested and approved to absorb impact energies of up to 8000 kJ. A total number of 15 barriers were installed in different locations with energy absorption capacity ranging from 3000 kJ up to 8'000 kJ.

See also our rockfall project Trek route to Shri Mata Vaishno Devi Shrine (1)

Client

Shri Mata Vaishno Devi Shrine Board

Antreprenor

Pioneer Foundation Engineers Pvt Ltd.

Obiect protejat

Road, Clădire, infrastructura turistică, Infrastructură, Arhitectură, Altele

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Tehnologie

Tehri Hydro Development Corporation Ltd.

Alte aplicaţii instalate

Protecţia împotriva căderilor de pietre

Contactul dvs. local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Inginerie hidraulică
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Statele Unite Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Inginerie hidraulică
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Statele Unite Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Inginerie hidraulică
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Statele Unite Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Inginerie hidraulică
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Statele Unite Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / Statele Unite Sales Director

E-mail