Elveţia
Elveţia

myGeobrugg

Stabilizarea pantelor - Stromeferry Railway Station 2021

Railway protection with TECCO mesh

Stabilizarea pantelor - Stromeferry Railway Station 2021

TECCO on rock slope

 
 

Anul instalării

2021

Situația inițială

Several rock blocks had fallen into the cess, the largest of which was 1.8 x 1.0 x 0.7 cubic meters. After inspection, a length of 80 meters was found to have the potential for failure.
The designer needed a strong solution, which was quick to design and rapidly available for emergency repairs.

Geologie

Lewisian Gneiss

Descriere

We supplied TECCO G65/3 on short notice to a remote site in the Highlands. While working with the designer in the background, we ensured they had all the necessary technical data for their design.

Client

Network Rail

Antreprenor

Scots Rope Access

Obiect protejat

Calea ferata

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Tehnologie

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail