Stabilizarea pantelor - Schwäbisch Gmünd 2015

Overview of the stabilized slope with area for future building foundation in the back

Stabilizarea pantelor - Schwäbisch Gmünd 2015

Fresh cut after nailing - visible erosion prone ground conditions

Stabilizarea pantelor - Schwäbisch Gmünd 2015

Hydraulic piling machine used on the project

Stabilizarea pantelor - Schwäbisch Gmünd 2015

Installation of the TECCO® SYSTEM3 and anti-erosion mat. Visible piling activity in the background

Stabilizarea pantelor - Schwäbisch Gmünd 2015

.

Stabilizarea pantelor - Schwäbisch Gmünd 2015

Tallest slope area after hydroseeding

Stabilizarea pantelor - Schwäbisch Gmünd 2015

Fully protected slope after hydroseeding. Pile wall visible at the base of the slope.

Stabilizarea pantelor - Schwäbisch Gmünd 2015

Revegetation on the fully protected slope during building construction

 
 

Anul instalării

2015

Situația inițială

The developer was planning several residential buildings on the hillside north of the river Rems in Schwabisch Gmund (near Stuttgart). The pit was created with a pile wall for excavation support. This area was backfilled after the buildings were completed. In the upper slope area, which remains visible; however, the developer chose to implement a solution that allows revegation.

Geologie

The slope incision is located in the Stubensandstein layer, and is therefore partly based on stiff loams.

Descriere

For dimensioning the nail grid pattern global stability was observed and recorded first. In a second step the near-surface instabilities were dimensioned. As is typical for most excavation activity, this slope was excavated from the top down in 1.5 m increments. Immediately following excavation the erosion control mat and TECCO® System were anchored in place with soil nails.

The solution was chosen because:

- Cohesive soils / grounds with an appropriate supply of nutrients for successful revetation,

- Active and immediate greening of the embankment by hydroseeding,

- Through future building the slope will be shaded,

- Four years ago, a similar project using TECCO® System was completed nearby and has shown successful revegetation.

Client

((... wil be completed by STS/GRE))

Obiect protejat

Clădire

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Alte companii implicate

Sidla & Schönberger Spezialtiefbau GmbH

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail