Elveţia
Elveţia

myGeobrugg

Protecţia împotriva căderilor de pietre - San Francisco Dump 2022

RXE-1000 H6 San Francisco Dump, barrier

Protecţia împotriva căderilor de pietre - San Francisco Dump 2022

Close up of brake, side and retaining anchorages

Protecţia împotriva căderilor de pietre - San Francisco Dump 2022

RXE-1000 first barrier post

Protecţia împotriva căderilor de pietre - San Francisco Dump 2022

RXE-1000 barrier seen from the mountain towards the valley

Protecţia împotriva căderilor de pietre - San Francisco Dump 2022

Close up of retention anchors towards the mountain

Protecţia împotriva căderilor de pietre - San Francisco Dump 2022

Detail of connection between nets and secondary mesh (DELTAX)

Protecţia împotriva căderilor de pietre - San Francisco Dump 2022

View towards the valley and protected infrastructure

Protecţia împotriva căderilor de pietre - San Francisco Dump 2022

RXE-1000 barrier, detail of the brake and lateral anchorage on the final post

 

Lungime sistem

- 130 m

 

Anul instalării

2022

Situația inițială

Anglo American needed protection against rock falls for the San Francisco Dump. Leaching works are carried out in this area. The dump is constantly exposed to falling rocks due to the upstream transport and unloading of materials.

Descriere

A dynamic rockfall barrier of the RXE type was installed. This type of barrier is simple and easy to install and dissipates high energies.

The barrier is designed for a block with an energy of 200 kJ, an impact speed of 17 m/s and a system height of 6 meters, as requested by the client.

Antreprenor

Pucará S.A.

Obiect protejat

Road, Carieră / Mina, Infrastructură

Protecţie împotriva coroziunii

Galvanized, GEOBRUGG SUPERCOATING

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail