Production hall protection system

Protecţia la impact - Production hall protection system 2019

Completely installed safety net still with the yellow installation straps

Protecţia la impact - Production hall protection system 2019

Before installing the safety net: the hall is open up to the ridge and the glass skylights; the suspended ceiling has no protective functions

Protecţia la impact - Production hall protection system 2019

Laterally fixed steel bars for fastening the safety net with the brakes

Protecţia la impact - Production hall protection system 2019

Delivery of the mesh rolls

Protecţia la impact - Production hall protection system 2019

Close-up: 2 of 160 brake boxes

Protecţia la impact - Production hall protection system 2019

The high-tensile steel wire mesh was rolled out using assembly belts. The panels were then connected with a seam rope.

Protecţia la impact - Production hall protection system 2019

The wire mesh allows the light to pass and protects the employees

 

Anul instalării

2019

Situația inițială

Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.

Descriere

With a feasibility study we have proven the effectiveness of a protection system within a building (SMP Ingenieure im Bauwesen GmbH in Karlsruhe).

Stahlbau Schauenberg GmbH - supported by one of our assembly instructors - installed the system in the production hall.

During the installation of the nets, ropes and brake elements supplied by Geobrugg, our assembly technician supervised the assembly.

Dimensions

  •     6.5 meters wide
  •     80 meters long

Client

n.a.

Antreprenor

Stahlbau Schauenberg GmbH

Obiect protejat

Clădire, Infrastructură

Tehnologie

Geobrugg

Alte companii implicate

Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.