Elveţia
Elveţia

myGeobrugg

Prevenirea avalanşelor - Los Bronces (2) 2014

.

Prevenirea avalanşelor - Los Bronces (2) 2014

.

Prevenirea avalanşelor - Los Bronces (2) 2014

.

Prevenirea avalanşelor - Los Bronces (2) 2014

.

Prevenirea avalanşelor - Los Bronces (2) 2014

.

 

Lungime sistem

300 m - 300 m

 

Anul instalării

2014

Situația inițială

A new installation was built near a slope with a high avalanche potential. Protective measures were therefore necessary.

Descriere

The installed avalanche fences prevent the formation of avalanches.

Client

Anglo American, Los Bronces

Antreprenor

Geobrugg Andina

Tehnologie

Anglo American, Los Bronces

Alte companii implicate

Geobrugg Iberica

Alte aplicaţii instalate

Minerit / Tuneluri

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail