La Entrada - Santa Rosa de Copán. Km152

Stabilizarea pantelor - La Entrada - Santa Rosa de Copán. Km152 2019

Road after the installation of the protective mesh with preinstalled erosion control mat

Stabilizarea pantelor - La Entrada - Santa Rosa de Copán. Km152 2019

Installation of the spike plates

Stabilizarea pantelor - La Entrada - Santa Rosa de Copán. Km152 2019

Slope stabilized with TECCO® GREEN G65/3

 

Anul instalării

2019

Situația inițială

Large blocks were likely to fall from the erosional layer at the bottom of the rockface.

Geologie

Top layer: fractured rock
Bottom: soil

Descriere

To stabilize the blocks and to control the erosion on the lower layer TECCO® GREEN mesh with 6 m nails, a pattern of 2.3 x 2.3 m was installed.

Client

BCIE

Antreprenor

Gabriel Couto

Obiect protejat

Road

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Tehnologie

ACI

Alte companii implicate

ICA Inversiones

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail