Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

The barriers protect the road against rockfalls. Six RXI-500 barriers which can absorb up to 5000 kJ were installed on the site totaling 518 meters with post heights ranging from 6.5 to 8.5 meters. Additionally: RXI-300 (3000 kJ, 70 meters long) and an RXI-200 (2000 kJ, 54 meters long). Slope stabilization with TECCO® G65/3. In total, about 10,200 square meters of slope stabilization and drapery systems were installed on the site.

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

AbAli rockfall zone without protection measures which clearly shows the risks present at the road

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

A specialist from Geobrugg is surveying the site in order to gather the necessary information for the design of the rockfall barriers

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

Record of significant rockfall events in the project zone

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

Three mobile cranes were drilling and grouting for the project. In total, 8,000 meters of drilling and grouting of boreholes were completed.

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

RXI-500 posts being installed on top of the masonry wall

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

ROCCO® ring nets for RXI-500 (5000 kJ) are being installed using a basket lift with a mobile crane

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

Lifting heavy 8.5 meters RXI-500 posts using a mobile crane

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

Set-up of the project site in order to control passing traffic

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

Example of a significant block being caught during the installation phase!

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

Installing a TECCO® drape system in order to stabilize the slope

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

SPIDER® System is applied in order to stabilize a massive block

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

Installed barriers on the slope protecting the road against rockfalls

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

Final view of SPIDER® System stabilizing a large block

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

Example of a rockfall incident at the installed barrier سيستم هاي سنگ گير در پروژه کرج

Protecţia împotriva căderilor de pietre - Haraz Road AbAli 2012

Two RXI-500 (5000 kJ) rockfall barriers adjacent to each other

 

Lungime sistem

30 m - 115 m

 

Anul instalării

2012

Situația inițială

Haraz is a major route connecting Tehran to the Northen cities in Mazandaran province by the Caspian Sea. As Haraz connects Tehran to the Northern part of Iran, it has to go through Alborz mountains. Along the road, there are many areas with rockfall incidents or slope instabilities.

In AbAli area, the situation was much worse. Massive rockfalls occurred over the course of the years which caused significant damages. Traffic was also increasing year over year and the need to extend the current road & protect it against hazards was a high priority.

Tehran RMTO (Road Maintenance & Transportation Office) considered various solutions in order to stabilize the current situation. Knowing that the road extension project was also in the works, using traditional protection measures such as concrete gallery was in question as it was both very costly and road closures were required.

Descriere

In order to identify the riskiest areas, specialists from Geobrugg and Geotech executed a detailed study of all hazards. Rockfall barriers and slope stabilization solutions were developed for each specific area in order to protect the road. (The road was also extended from two lanes to five lanes.)

The protected area was about 650 meters long. A total of eight rockfall barriers with highest energy class of 5000 kJ were installed. Back in 2012 this project definitely set a record in the Middle East - and worldwide!

Client

Tehran Road Maintenance & Transportation Office

Antreprenor

Geotech Company

Obiect protejat

Road

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Alte aplicaţii instalate

Stabilizarea pantelor

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail