Elveţia
Elveţia

myGeobrugg

Protecţia împotriva torenţilor şi a alunecărilor superficiale - Gaviota Pass 2004

Ringnet barrier at work

Protecţia împotriva torenţilor şi a alunecărilor superficiale - Gaviota Pass 2004

Debris flow barrier

Protecţia împotriva torenţilor şi a alunecărilor superficiale - Gaviota Pass 2004

Ringnet barrier protecting th culvert

 

Sisteme

 

Lungime sistem

13 m

 

Anul instalării

2004

Situația inițială

This drain was regularly blocked by alluvial material.

Descriere

Installation of a ring net barrier directly in front of the culverts that retains solid material and allows watery, fine material to flow through. The material was retained in the course of three debris flow events without impairing the through traffic. Following excavation the barriers were again fully functional.

Client

-

Obiect protejat

Road

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail