Elveţia
Elveţia

Gamsgrubenweg, Grossglockner

Grossglockner, Austria
2013
Client
Grossglockner Hochalpenstrassen AG
Tehnologie
Ingenieurbüro Tschernutter Consulting GmbH
Antreprenor
Felbermayr Bau GmbH
Obiect protejat
Road
Clasă de energie
1000 kJ
Înălţime sistem
1.0 m, 1.5 m
Protecţie împotriva coroziunii
GEOBRUGG SUPERCOATING
Situația inițială

To protect from rockfall on an alpine trail at the mountain Grossglockner in Austria, a new rockfall gallery was built between two tunnels.

Descriere

The damping system ROCKFALL-X G was used on top of the gallery to economically dampen rockfall impacts with a calculated energy of up to 800 kJ. For this purpose 85 bags of the 1.3 m high damping modules were prepared in Geobrugg factory and delivered directly to the construction site.

Contactul dvs. local

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Natural Hazards, Coastal Erosion Protection, Minerit / Tuneluri
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Elveţia
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Natural Hazards, Minerit / Tuneluri
Geobrugg AG
Industriestrasse 21
5200 Brugg / Elveţia
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Natural Hazards, Minerit / Tuneluri
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Elveţia