Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg
Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg
Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg
Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg
Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg
Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg
Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg
Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg Camarillo Springs emergency Debris Flow Barriers 2015 - Geobrugg

Camarillo Springs emergency Debris Flow Barriers

   Partajaţi
Cod poştal
93012
Loc:
Camarillo, CA
Ţară / Regiune
Statele Unite
Anul instalării
2015
Client
City of Camarillo
Tehnologie
Kane Geotech, Inc.
Antreprenor
Access Limited Construction Co., Inc.
Obiect protejat
Clădire
Sisteme
VX140-H4, VX160-H6, UX180-H6, SL-150
Înălţime sistem
3.5 m, 4.0 m, 6.0 m
Lungime sistem
6 m - 25 m
Protecţie împotriva coroziunii
Galvanized, GEOBRUGG SUPERCOATING®
Număr de bariere
5
Capacitate de retenţie
total 24,000 CY or 18,350 m³
Situația inițială

After wildfires stripped the hills bare of vegetation, torrential rains during the monsoon season of 2014 created significant debris flow events impacting and devastating homes. With the 2015 El Niño approaching, preventive measures were quickly installed in the hillsides above Camarillo Springs as the primary mitigation measure against future debris flows.

Descriere

The City of Camarillo hired the engineering company Kane Geotech, Inc. (Kane Geotech) to design debris flow mitigation measures. Dr. William Kane designed a plan and specified use of Geobrugg’s debris flow and shallow landslide barriers placed strategically within high risk culverts (barrancas).

At the end of 2015 the City of Camarillo hired Access Limited Construction Co., Inc. (Access Limited) to install the Geobrugg systems. Access Limited worked with Kane Geotech and Geobrugg to have the barriers installed before the monsoons hit. Geobrugg delivered material and Access Limited completed installation well ahead of the January 31st deadline. El Niño reached California the very next week and the Geobrugg Debris Flow barriers performed as designed.

Retention capacity:

Barranca 1 = 2,000 CY / 1,530 m³
Barranca 2 = 10,000 CY / 7,645  m³
Barranca 3 =12,000 CY / 9,175 m³
Total of 24,000 CY / 18,350 m³

Watch the clip on keyt-tv, Santa Barbara

Contactul dvs. local

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / Statele Unite
Telefon +1 860 377 3230

Formular de contact

Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / Statele Unite
Telefon +1 909 706 8964

Formular de contact

John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / Statele Unite
Telefon +1 505 220 1404

Formular de contact

Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / Statele Unite
Telefon +1 336 337 0945

Formular de contact

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Telefon +1 505 771 4080
Mobil +1 505 400 0796

Formular de contact

Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / Statele Unite
Telefon +1 503 423 7258

Formular de contact