Cacheuta Tunnel - Mendoza - Road N°82

Protecţia împotriva căderilor de pietre - Cacheuta Tunnel - Mendoza - Road N°82 2020

General view of the stabilized slope: TECCO® G65/3 system and the 4 meters high dynamic barrier RXE-500

Protecţia împotriva căderilor de pietre - Cacheuta Tunnel - Mendoza - Road N°82 2020

Drilling for the anchors (3.5 meters deep holes)

Protecţia împotriva căderilor de pietre - Cacheuta Tunnel - Mendoza - Road N°82 2020

Installing the mesh at the prepared slope

Protecţia împotriva căderilor de pietre - Cacheuta Tunnel - Mendoza - Road N°82 2020

In this section Rolled Cable Net QUAROX® and DELTAX® are installed

Protecţia împotriva căderilor de pietre - Cacheuta Tunnel - Mendoza - Road N°82 2020

TECCO® system stabilizing the rockface

Protecţia împotriva căderilor de pietre - Cacheuta Tunnel - Mendoza - Road N°82 2020

Assembly of the 4 meters high and 52 meters long rockfall barrier RXE-500

Protecţia împotriva căderilor de pietre - Cacheuta Tunnel - Mendoza - Road N°82 2020

Completed RXE-500 rockfall barrier

Protecţia împotriva căderilor de pietre - Cacheuta Tunnel - Mendoza - Road N°82 2020

View up the rockface - RXE-500 rockfall barrier

Protecţia împotriva căderilor de pietre - Cacheuta Tunnel - Mendoza - Road N°82 2020

Debris flow protection ring net VX060L, 4 meters high, 10 meters long

 

Lungime sistem

10 m - 52 m

 

Anul instalării

2020

Situația inițială

In a section of Route 82, near the entrance of the Cacheuta tunnel N°1, rocks frequently fell on the road. These and landslides represented a danger for the traffic.

Descriere

Several systems of protection against rockfall and debris flow, as well as slope stabilization, were implemented.

Installed systems per section:
1a)  RXE-500: 4 meters high and 31 meters long
1b)  VX-060L: 4 meters high and 10 meters long
2)  RXE-500: 4 meters high and 24 meters long
3)  RXE-500 :4 meters high and 42 meters long

4)  972 m² Rolled Cable Net QUAROX® Plus DELTAX®
     774 m² TECCO® G65/3 grid 2x2
     847 m² DELTAX® G80/2

Obiect protejat

Road

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Alte aplicaţii instalate

Protecţia împotriva căderilor de pietre, Stabilizarea pantelor, Protecţia împotriva torenţilor şi a alunecărilor superficiale

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail