Stabilizarea pantelor - Bridger Coal Mine 2004

Protective mesh installed on the rockface slope

Stabilizarea pantelor - Bridger Coal Mine 2004

Installation of TECCO® G65/3

Stabilizarea pantelor - Bridger Coal Mine 2004

Installed TECCO®

Stabilizarea pantelor - Bridger Coal Mine 2004

Mesh covering the rock

 
 

Anul instalării

2004

Situația inițială

At this open pit mine, tunnel portals were put to go underground to follow coal seams. These tunnel portals are located at the bottom of a high wall.

Descriere

The high wall was draped with TECCO® System mesh to protect personnel and equipment during construction and operation of the portals.

Client

Private

Antreprenor

Yenter Companies

Obiect protejat

Carieră / Mina

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Tehnologie

Seegmiller International

Alte aplicaţii instalate

Minerit / Tuneluri

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail