Borusan EnBW

Ispir Erzurum, Turcia
2019
Client
Borusan EnBW
Tehnologie
Geobrugg AG
Antreprenor
Artusa Geohazard
Obiect protejat
Altele
Înălţime sistem
6.0 m
Lungime sistem
15 m
Protecţie împotriva coroziunii
GEOBRUGG SUPERCOATING®
Număr de bariere
1
Capacitate de retenţie
3000 m³
Situația inițială

At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system.  Around 5'000 m³ of debris damaged the HPP area.

Descriere

At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.

Contactul dvs. local

Roger Moor
Roger Moor
Ost- und Zentralschweiz, Liechtenstein - Country Manager
Natural Hazards, Minerit / Tuneluri
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Elveţia
René Müller
René Müller
Country Manager Western Switzerland (AG, BE, BL, BS, FR, GE, JU, NE, SO, VD, VS)
Natural Hazards, Minerit / Tuneluri
Geobrugg AG
Industriestrasse 21
5200 Brugg / Elveţia
Isacco Toffoletto
Isacco Toffoletto
Country Manager Southern Switzerland (TI)
Natural Hazards, Minerit / Tuneluri
Geobrugg AG
Via Pizzante 7
6595 Riazzino / Elveţia
Jonas von Wartburg
Jonas von Wartburg
Country Manager Western Switzerland/Scandinavia
Natural Hazards, Minerit / Tuneluri
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Elveţia