Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg

Bont Evans Tree Works Scheme

   Partajaţi
Strada:
A487 Goedwig Corris
Cod poştal
SY20 9AT
Loc:
Machynlleth
Ţară / Regiune
Regatul Unit
Anul instalării
2018
Client
Natural Resources Wales
Tehnologie
CAULMERT
Antreprenor
Colin Jones Rock Engineering Ltd
Obiect protejat
Road, infrastructura turistică
Sisteme
GBE-100A-R
Clasă de energie
100 kJ
Înălţime sistem
2.0 m
Lungime sistem
930 m
Protecţie împotriva coroziunii
Galvanized, GEOBRUGG SUPERCOATING®
Situația inițială

Natural resource Wales need to clear the hillside of trees that have grown too tall and create a safety concern for road users, hill walkers, and tourists. During early stage investigation, many rock outcrops were found on site and concerns were raised of potential rockfall created during the tree harvesting process. The harvesting is undertaken by, and this involves the lifting and dragging of the cut tree to the stockpile. Potentially dislodging rock and debris in the process.

Descriere

Working alongside Caulmert we were able to supply experience and materials to this complex build and provide a temporary rockfall fence along the full road boundary of the site.

Colin Jones Rock Engineering stalled the GBE-100A-R of two m in height. The ground anchors are IBO R32 bar to depths of 2.5 m. Where rock head was not at surface the fence post bases are constructed of 1000 x 500 x 400 triple reinforced concrete bases. A combination of Geobrugg Type III wire rope anchors or Geobrugg Flexheads for IBO R32 bar drilled to depths of 4.5 m.

Contactul dvs. local

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / Statele Unite
Telefon +1 860 377 3230

Formular de contact

Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / Statele Unite
Telefon +1 909 706 8964

Formular de contact

John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / Statele Unite
Telefon +1 505 220 1404

Formular de contact

Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / Statele Unite
Telefon +1 336 337 0945

Formular de contact

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Telefon +1 505 771 4080
Mobil +1 505 400 0796

Formular de contact

Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / Statele Unite
Telefon +1 503 423 7258

Formular de contact