Elveţia
Elveţia

Bodenberg B21

83458, Schneizlreuth
2020
Antreprenor
Obiect protejat
Road, Infrastructură, Altele
Înălţime sistem
3.5 m
Lungime sistem
60 m
Alte aplicaţii instalate
Protecţia împotriva căderilor de pietre
Situația inițială

Scaling activities must take place at Bodenberg B21. In order to keep the road open, the road authorities had to select a system that protects both traffic from the falling rock and the road workers from the traffic. They required that the system is robust and quickly deployable.

Descriere

The solution: 60 meters of homologated mobile debris fence (mDF350-2) while keeping one lane of the road open within two weeks of order. The installation took 4 hours to complete. It allows for the road to remain open during the entire works.

Contactul dvs. local

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Natural Hazards, Coastal Erosion Protection, Minerit / Tuneluri
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Elveţia
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Natural Hazards, Minerit / Tuneluri
Geobrugg AG
Industriestrasse 21
5200 Brugg / Elveţia
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Natural Hazards, Minerit / Tuneluri
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Elveţia