스위스
스위스

myGeobrugg

Röthenbach Driftwood Protection

토석류 및 산사태 방호 시스템 - Röthenbach Driftwood Protection 2016

One year after installation of the dam, protecting against driftwood

토석류 및 산사태 방호 시스템 - Röthenbach Driftwood Protection 2016

Installed Geobrugg's flex heads - they are enough to support the whole VX type barrier

토석류 및 산사태 방호 시스템 - Röthenbach Driftwood Protection 2016

Concrete dam with already installed flex heads just before VX debris flow barrier installation

토석류 및 산사태 방호 시스템 - Röthenbach Driftwood Protection 2016

VX debris flow barrier under installation - only lightweight equipment is enough

토석류 및 산사태 방호 시스템 - Röthenbach Driftwood Protection 2016

Installation details - double corrosion protected wire rope anchors and brake rings

토석류 및 산사태 방호 시스템 - Röthenbach Driftwood Protection 2016

ROCCO® ring net offering perfect balanced permeability together with high load capacity

토석류 및 산사태 방호 시스템 - Röthenbach Driftwood Protection 2016

VX type customized debris flow barrier after installation

토석류 및 산사태 방호 시스템 - Röthenbach Driftwood Protection 2016

Final barrage providing drift wood protection

 

Systems

 

System length

- 8 m

 

Year of installation

2016

Situation

To provent floods from driftwood in the Röthenbach area a special dam with barrier was planned at the Toblebach torrent.

Description

To protect the sliders of the barrier against felling with wood, the protective net was placed on the water side. In this project we also supported the planners in the design of the network and during the installation.

For more information, for pictures and graphs see the customer's page Wasserwirtschaftsamt Kempten  (German).

Customer

Wasserwirtschaftsamt Kempten

Contractor

Max Wild GmbH

Protected object

Road, Touristic infrastructure, Residential area

Corrosion protection

Galvanized, GEOBRUGG SUPERCOATING

Engineering

Ingenieurbüro IWA GmbH / SteinbacherConsult Ingenieurgesellschaft mbH & Co. KG

Subcontractor

Allgäuer Landschaftspflege Gerd-Heinz Buchelt GmbH

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail