Hydroelectric Power Station Schattenhalb 1+

낙석방호시스템 - Hydroelectric Power Station Schattenhalb 1+ 2016

Overview of the installation site - visible the building endangered by rockfalls

낙석방호시스템 - Hydroelectric Power Station Schattenhalb 1+ 2016

ROCKFALL-X A system during installation (all materials were transported by a helicopter) - visible old tires positioning

 

Systems

 

System length

7 m - 10 m

 

Year of installation

2016

Situation

The builiding of the Hydroelectric Power Station Schattenhalb 1+ placed underneath the Reichenbach waterfalls, was endangered by regular rockfalls.

Description

In order to protect the building against rockfall, the roof had to be re-dimensioned and strengthened. The damping system ROCKFALL-X A (including old tires as dumping elements) was used for the economical protection against rockfalls with an expected energy up to 700 kJ on the 70 m² roof area.

Customer

BKW AG

Contractor

Ghelma Spezialtiefbau AG

Protected object

Building, Infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Ghelma Spezialtiefbau AG

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail