스위스
스위스

myGeobrugg

낙석방호시스템 - Opunake 2021

Boarder post with isolations between stainless and Galvanised/Epoxy components

낙석방호시스템 - Opunake 2021

Stainless T35 barrier contouring around existing services

낙석방호시스템 - Opunake 2021

Support rope separation

 

System length

157 m

 

Year of installation

2021

Situation

The holiday park is located at the bottom of a sea cliff which experiences small seasonal debris and rock releases. The site is located within close proximity to the sea in a C4 environment.

Description

A 157 m and 36 m long, 1.5 m high stainless steel T35 (35kJ) barrier with galvanised and epoxy posts was installed. Stainless steel was selected to guarantee design life in the corrosive C4 environment. The heavy-duty galvanised posts were epoxy coated and electrically isolated between all the stainless connections to eliminate galvanic corrosion. The T35 posts were embedded directly into the ground which enabled a fast, cost effective and flexible installation.

Customer

Protected object

Other

Corrosion protection

INOX / STAINLESS

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail