비탈면 보강 시스템 - Slunj 2021

SPIDER mesh S3-130 prevents the historic building from collapsing

비탈면 보강 시스템 - Slunj 2021

A slope stabilization system protects the historic landmark

 

Year of installation

2021

Situation

At the historical Slunj fortress, blocks of the limestone base collapsed. The ruins of Slunj were in danger.

Geology

Limestone

Description

The city of Slunj, the Croatian Government, and an EU fond were invested in rehabilitating the old fortress. It was stabilized with a concrete beam with nails then covered with a stone wall. Our part is the stabilization of the base of the fortress and the protection of people walking nearby. In a first step Spider S3-130 mesh with nails (32 mm, length 4 m) was installed. The protection of other areas of the slope with TECCO mesh G65/3 is planned.

Protected object

Touristic infrastructure, Architecture

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 미국 Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 미국 Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

자연 재해
유압 공학
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 미국 Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 미국 Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

자연 재해
Geobrugg North America, LLC,Salem OR 97302 / 미국 Sales Director

E-Mail