Suíça
Suíça

myGeobrugg

Estabilização de taludes - Zion Hill 2015

TECCO® SYSTEM3 after all protection works are finished.

Estabilização de taludes - Zion Hill 2015

Installed TECCO® SYSTEM3.

Estabilização de taludes - Zion Hill 2015

TECCO® G65/3 rolls during installation.

Estabilização de taludes - Zion Hill 2015

Slope nails installation using portable, suspended drill rig. For extra protection drilling works were executed through TECCO® G65/3 mesh.

 
 

Ano de instalação

2015

Situação inicial

Rockfall from the channel wings meant risk for the channel workers.

Descrição

Slope stabilization with TECCO® SYSTEM3 mesh and anchors with 32 mm diameter every 2.5 m.

Promotor

Autoridad del Canal de Panamá - ACP

Contratante

Alvarado & Düring International

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

Autoridad del Canal de Panamá - ACP

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail