Estabilização de taludes - Túneles de Artxanda 2019

Mesh roll-out for an easy installation process

Estabilização de taludes - Túneles de Artxanda 2019

Covering the steep slope with stabilizing mesh

Estabilização de taludes - Túneles de Artxanda 2019

The mesh is lightweight and after installation, barely visible

 

Sistemas

 

Ano de instalação

2019

Situação inicial

The Artxanda Tunnels connect the Txorierri Highway Corridor with Bilbao. In the vicinity of the tunnel entrance, several massive rocks broke. Rocks have fallen onto the roadway, thus endangering traffic. For this reason, Interbiak decided to stabilize this area.

Descrição

To stabilize the slopes, anchored concrete bars, and a flexible stabilization system were installed. The DELTAX® 80/3 mesh was anchored to the ground with bolts 25 mm in diameter and 6 m long, in a 3Vx4H m² grid.

Promotor

Interbiak, Diputación Foral de Vizcaya

Contratante

New Construction, S.L.

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail