Suíça
Suíça

myGeobrugg

Proteção contra correntes de detritos - Test Site Stream Lobental 2007

Test barrier under full load - visible pieces of wood stopped by the barrier, without blocking water flow

Proteção contra correntes de detritos - Test Site Stream Lobental 2007

Pieces of wood were deposited along the stream before water was release from the upper lake

Proteção contra correntes de detritos - Test Site Stream Lobental 2007

Overview of the test barrier - ancestor of Geobrugg's Debris Flow Barriers. Visible load cells and their signal cables

Proteção contra correntes de detritos - Test Site Stream Lobental 2007

Load cells data were stored and analyzed directly on site

Proteção contra correntes de detritos - Test Site Stream Lobental 2007

Test barrier under full load - visible pieces of wood stopped by the barrier, without blocking water flow

Proteção contra correntes de detritos - Test Site Stream Lobental 2007

Front view of the test barrier under full load - visible pieces of wood stopped by the barrier, without blocking water flow

Proteção contra correntes de detritos - Test Site Stream Lobental 2007

View of the barrier during test from the upper lake side - barrier was fully loaded, incl. overflow

Proteção contra correntes de detritos - Test Site Stream Lobental 2007

Test barrier after the test - was able to stop the whole amount of wood without any failure, allowing full dewatering at the same time

Proteção contra correntes de detritos - Test Site Stream Lobental 2007

Stopped mass of wood after test - fully dewatered and ready to be removed

 

Comprimento do sistema

7 m - 7 m

 

Ano de instalação

2007

Situação inicial

For many years, the Bavarian Water Resources Administration used rope nets to entrap the wooden debris. The advantage of this construction is:
• simple building equipment can be used
• commercial components and common techniques can be used
• rope nets are inconspicuous and almost do not disturb the landscape.

The main structure to bear the forces consists of ropes, which are spanned across to the flow direction over the torrent. The nets have a distance of about 0,50 to 1,0 meter to the river bed so that smaller floods without wooden debris and bedload can pass unhindered.

The research project was carried out at the Institute for Hydraulic an Engineering at Technische Universität München, to answer the following questions:

• How is the process of the entrapment in rope dams proceeding?
• Which forces occur and what are the main parameters of influence?
• Which recommendations for the construction of net-dams can be given?

Descrição

In different model tests the entrapment process was analysed and the main parameters of influence were worked out. Furthermore a full-scale nature test on rope net barriers was realized to investigate dynamic loads in the beginning of the entrapment process and to work out the influence of elasticity. Significant for the design are only the static loads, which in nature are about 20 to 30 % higher then in model due to a greater volume of fine material with less dimension and sagging ropes respectively nets. The function of the net barriers was proved. The results lead to a design concept for rope net barriers.

Promotor

Wasserwirtschaftsämter Weilheim und Kempten

Contratante

Bremer Schutz-Verbauungen GmbH

Objecto protegido

Estrada, Caminho de ferro, Edifício, Pedreira/ Minas, Infra-estrutura turística, Área residencial, Infra-estrutura, Arquitectura, Arte, Outros

Proteção contra a corrosão

Galvanizado, GEOBRUGG SUPERCOATING

Empreteiro

Technical University Munich / Geobrugg AG

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail