Proteção contra desprendimentos - Sissach-Eptingen 2022

Protection systems above the national highway A2

Proteção contra desprendimentos - Sissach-Eptingen 2022

Transport by helicopter

Proteção contra desprendimentos - Sissach-Eptingen 2022

Mounting work

Proteção contra desprendimentos - Sissach-Eptingen 2022

Start of the night shift

Proteção contra desprendimentos - Sissach-Eptingen 2022

The protected highway from above

 
 

Comprimento do sistema

70 m - 225 m

 

Ano de instalação

2022

Situação inicial

Rockfalls endangered the Sissach-Eptingen section of the freeway, so the Swiss Federal Roads Office ASTRA commissioned a maintenance project. 

Descrição

The measures included rock cleaning, net covers, the installation of rockfall protection structures, the permanent tie-back of rock sections and the construction of concrete support piers.

To ensure the safety of road users, three different rockfall barriers with a total length of around 500 meters were installed. Work began at the end of June 2022 with nighttime work above both portals of the Oberburg Tunnel. One lane had to be closed to traffic at a time. 

Pictures: Gasser Felstechnik AG

País / Região

Suíça

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Riscos naturais
Engenharia Hidráulica
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça , Msc. Env. Eng.

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail