Estados Unidos
Estados Unidos

myGeobrugg

Schwarzenberg Murgtal Rappenriss

Proteção contra desprendimentos - Schwarzenberg Murgtal Rappenriss 2015

GBE-1000A rockfall protection barrier together with TECCO® SYSTEM3 secure the Rappenriss rock face.

Proteção contra desprendimentos - Schwarzenberg Murgtal Rappenriss 2015

Slope preparation work along the Rappenriss.

Proteção contra desprendimentos - Schwarzenberg Murgtal Rappenriss 2015

Cleaning the slope where a GBE-1000A barrier is to be installed.

Proteção contra desprendimentos - Schwarzenberg Murgtal Rappenriss 2015

GBE-1000A being staked for soil nails as part of slope preparation.

Proteção contra desprendimentos - Schwarzenberg Murgtal Rappenriss 2015

Erecting the GBE-1000A barrier in the foreground and drilling the Rappenriss in the background.

Proteção contra desprendimentos - Schwarzenberg Murgtal Rappenriss 2015

Drilling the nails at the Rappenriss with a lift. Below, the nearly complete GBE-1000A rockfall barrier is visible.

Proteção contra desprendimentos - Schwarzenberg Murgtal Rappenriss 2015

Installing a GBE-1000A drape directly below a TECCO® SYSTEM3 that stabilizes a single block in the cliff above.

Proteção contra desprendimentos - Schwarzenberg Murgtal Rappenriss 2015

Final installation of TECCO® G65/3 and TECCO® G65/4 meshes. Visible: full coverage of the Rappenriss massif.

 

Sistemas

 

Comprimento do sistema

40 m - 130 m

 

Ano de instalação

2015

Situação inicial

As part of the widening of the bicycle path along the main road (B462) a dominant rocky outcrop, the Rappenrisshad to be securely stabilized.

Descrição

To protect the road and the bike path two GBE 1000A rockfall barriers were installed. In addition parts of the slope were actively stabilized with TECCO® SYSTEM3 (TECCO® G65/3 and TECCO® G65/4).

Promotor

Regierungspräsidium Karlsruhe

Contratante

Königl GmbH & Co KG

Objecto protegido

Estrada, Infra-estrutura turística

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

Ingenieurgruppe Geotechnik

Outras aplicações instaladas

Estabilização de taludes

O seu contacto local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Estados Unidos Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Estados Unidos Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Estados Unidos Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Estados Unidos Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Riscos naturais
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Riscos naturais
Geobrugg North America, LLC,Salem OR 97302 / Estados Unidos Sales Director

E-mail