Estabilização de taludes - Schwäbisch Gmünd 2015

Overview of the stabilized slope with area for future building foundation in the back

Estabilização de taludes - Schwäbisch Gmünd 2015

Fresh cut after nailing - visible erosion prone ground conditions

Estabilização de taludes - Schwäbisch Gmünd 2015

Hydraulic piling machine used on the project

Estabilização de taludes - Schwäbisch Gmünd 2015

Installation of the TECCO® SYSTEM3 and anti-erosion mat. Visible piling activity in the background

Estabilização de taludes - Schwäbisch Gmünd 2015

.

Estabilização de taludes - Schwäbisch Gmünd 2015

Tallest slope area after hydroseeding

Estabilização de taludes - Schwäbisch Gmünd 2015

Fully protected slope after hydroseeding. Pile wall visible at the base of the slope.

Estabilização de taludes - Schwäbisch Gmünd 2015

Revegetation on the fully protected slope during building construction

 
 

Ano de instalação

2015

Situação inicial

The developer was planning several residential buildings on the hillside north of the river Rems in Schwabisch Gmund (near Stuttgart). The pit was created with a pile wall for excavation support. This area was backfilled after the buildings were completed. In the upper slope area, which remains visible; however, the developer chose to implement a solution that allows revegation.

Geologia

The slope incision is located in the Stubensandstein layer, and is therefore partly based on stiff loams.

Descrição

For dimensioning the nail grid pattern global stability was observed and recorded first. In a second step the near-surface instabilities were dimensioned. As is typical for most excavation activity, this slope was excavated from the top down in 1.5 m increments. Immediately following excavation the erosion control mat and TECCO® System were anchored in place with soil nails.

The solution was chosen because:

- Cohesive soils / grounds with an appropriate supply of nutrients for successful revetation,

- Active and immediate greening of the embankment by hydroseeding,

- Through future building the slope will be shaded,

- Four years ago, a similar project using TECCO® System was completed nearby and has shown successful revegetation.

Promotor

((... wil be completed by STS/GRE))

Objecto protegido

Edifício

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Outras empresas envolvidas

Sidla & Schönberger Spezialtiefbau GmbH

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail