Suíça
Suíça

myGeobrugg

San José Calderas Road 27, km 45.8

Estabilização de taludes - San José Calderas Road 27, km 45.8 2015

Stabilized slope - with TECCO®. The system adapts to the slope's irregularities.

Estabilização de taludes - San José Calderas Road 27, km 45.8 2015

TECCO® G65/3 rolls are installed using rope access techniques

Estabilização de taludes - San José Calderas Road 27, km 45.8 2015

Spike plate P33/40 installation on the top of the slope

 
 

Ano de instalação

2015

Situação inicial

After a rockslide event which blocked the traffic, a slope stabilization became necessary

Descrição

Active slope stabilization was implemented using TECCO® System anchored with 8 m threadbare nails in a pattern of  2.0 m by 2.0 m.

Promotor

Globalvia Ruta 27

Contratante

Rodio Swissboring

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

INSUMA S.A.

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail