Estabilização de taludes - Rahovei 20, Cluj-Napoca 2013

Slopes fully protected with soil nailing and GREENAX® mesh (composite with TECMAT® anti-erosion mat)

Estabilização de taludes - Rahovei 20, Cluj-Napoca 2013

Superficial instabilities and erosion at the slope

Estabilização de taludes - Rahovei 20, Cluj-Napoca 2013

The vegetation could not stabilize the slope due to very intense sliding and erosion

Estabilização de taludes - Rahovei 20, Cluj-Napoca 2013

After vegetation removal, soil nails were installed to stabilize the slope globally

Estabilização de taludes - Rahovei 20, Cluj-Napoca 2013

Because of the geothermal installation it was impossible to install soil nails on top of the slope. The mesh was fixed and tensioned with special setup of the border rope

Estabilização de taludes - Rahovei 20, Cluj-Napoca 2013

Final tightening of Geobrugg's P33/40 spike plates

Estabilização de taludes - Rahovei 20, Cluj-Napoca 2013

Another overview of the slope with soil nailing and active protection solution.

 

Sistemas

 

Ano de instalação

2013

Situação inicial

This 7 to 8 meters high slope was cut in order to build a private house. Due to the geotechnical data, the slope should have been stable at 40 degrees and  up to 4.9 m. When the owner installed the pipes for a geotermal pump on top of the slope, the slope began to fail.

Geologia

Silt and clay.

Descrição

Geobrugg designed and delivered a complete protection system. The solution was a standard soil nailing together with GREENAX® mesh. A total of 229 m² were stabilized using 40 soil nails R32.  They were installed in the pattern of 2.50 x 2.20 m.

Promotor

Private customer

Contratante

S.C. MAVO Transilvania S.R.L.

Objecto protegido

Edifício

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

Zenith Proiect and Consulting

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail