Suíça
Suíça

myGeobrugg

Proteção contra desprendimentos - Piwniczna Zdrój DK87 2016

GBE-500-A rockfall barrier along the state road DK87 Piwniczna Zdrój

Proteção contra desprendimentos - Piwniczna Zdrój DK87 2016

Loose rock above the road

Proteção contra desprendimentos - Piwniczna Zdrój DK87 2016

Over 350 meters of road protected by rockfall barriers

 
 

Comprimento do sistema

108 m - 252 m

 

Ano de instalação

2016

Situação inicial

During the construction of the DK87 national road on the section Piwniczna Zdrój, rock fragments falling from the Kicaz mountain slope were identified as a threat to the traffic.

Descrição

To protect the road from rock chips and boulders, GBE-100-A-R and GBE-500-A rock catch fences were installed in four locations. The total length of all barriers is 360 meters.

Check also the Piwniczna Zdrój DW97 slope protection project.

País / Região

Polónia

Promotor

GDDKiA Oddział Kraków

Empreteiro

BMD Sp. z o.o.

Contratante

BMD Sp. z o.o.

Proteção contra a corrosão

Galvanizado

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Riscos naturais
Engenharia Hidráulica
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça , Msc. Env. Eng.

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail