Merag Ferry Port - Island of Cres

Proteção contra desprendimentos - Merag Ferry Port - Island of Cres 2025

Installation of the rockfall barrier, secondary mesh grants protection from gravel

Proteção contra desprendimentos - Merag Ferry Port - Island of Cres 2025

Access road to the port, rockfall protection with GBE-2000A

Proteção contra desprendimentos - Merag Ferry Port - Island of Cres 2025

One field barrier ROCCO-2000

Proteção contra desprendimentos - Merag Ferry Port - Island of Cres 2025

Keeps the loose gravel in place - slope stability with TECCO® G45/2

Proteção contra desprendimentos - Merag Ferry Port - Island of Cres 2025

Attendance line for the ferry boat, protection from smaller rocks with fine, high-tensile TECCO® G45/2 mesh

Proteção contra desprendimentos - Merag Ferry Port - Island of Cres 2025

Slope stabilization with TECCO® G45/2

 
 

Comprimento do sistema

12 m - 80 m

 

Ano de instalação

2025

Situação inicial

The access road DC101 to the Merag ferry port on the island of Cres was exposed to frequent rockfall risk due to steep, weathered karst slopes above a heavily trafficked road. During peak summer periods, even small rockfall events posed serious danger to people, vehicles, and uninterrupted ferry operations. Traditional protection measures were insufficient for high-energy and complex impact scenarios, including simultaneous and eccentric block impacts. The installation of active slope stabilization with TECCO G45/2 mesh, combined with GBE-2000A and the ROCCO-2000 barrier, addressed both rock detachment and extreme impact conditions. This integrated solution transformed a high-risk bottleneck into a resilient and safe access route to critical island infrastructure.

Descrição

Raised safety level on the access road to the Merag ferry terminal
The project focused on protecting the road DC101 from potential rockfalls and slope instabilities.

Installed solutions are:

  • GBE-2000A rockfall barrier (H = 5 m, L = 80 m)
  • TECCO G45/2 high-tensile steel mesh (11,115 m²) for active slope stabilization, slope height 5-15 m, inclination 60-75°, Limestone and Dolomite,

    and as a remarkable milestone of this project is the first installation in the Balkans of a
  • ROCCO-type barrier (ROCCO-2000), with a height of 5 m and a length of 12 m (one-field barrier)

País / Região

Croácia

Empreteiro

rijekaprojekt d.o.o.

Contratante

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Asset Management / Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Country Manager Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Asset Management / Monitoring
Geobrugg AG Country Manager Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Asset Management / Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Country Manager Southern Switzerland

E-mail