Ligne Montréjeau-Luchon - Reprofilage du tunnel Cap du Mail

Mineração / Túneis - Ligne Montréjeau-Luchon - Reprofilage du tunnel Cap du Mail 2024

The renovated tunnel, secured with a system of rock bolts and mesh.

Mineração / Túneis - Ligne Montréjeau-Luchon - Reprofilage du tunnel Cap du Mail 2024

Tunnel re-profiling using a tunnel saw

Mineração / Túneis - Ligne Montréjeau-Luchon - Reprofilage du tunnel Cap du Mail 2024

Additional local re-profiling using a hydraulic rock breaker

Mineração / Túneis - Ligne Montréjeau-Luchon - Reprofilage du tunnel Cap du Mail 2024

Installation of MINAX G80/3 mesh, protecting against falling debris

 
 

Ano de instalação

2024

Situação inicial

As part of the rehabilitation work on the Montréjeau-Luchon railroad, the Cap du Mail tunnel needed to be reprofiled to allow the passage of the new trains, which are wider than the old ones.

Descrição

The new clearance profile for this 70-meter tunnel was achieved by cutting back the tunnel by an average of 20 cm. Subsequently, a safety system for future rail traffic was installed using a combination of rock bolts and MINAX mesh.

País / Região

França

Promotor

La Région Occitanie

Empreteiro

Société Alpine de Géotechnique

Contratante

NGE Fondations

Outras empresas envolvidas

Alsacienne de minage et démolition

Objecto protegido

Caminho de ferro

O seu contacto local

Dane Wagner
 

Dane Wagner

Open Pit Mining / Quarries Business Development Manager

Mineração / Túneis
Geobrugg North America, LLC,10700 SW Beaverton Hillsdale Hwy, Suite #470-1,97005 Beaverton / Estados Unidos Open Pit Mining / Quarries Business Development Manager

E-mail