Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade

Estabilização de taludes - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

The TECCO system combined with hydro mulching perfectly stabilizes the railway embankment and prevents further traffic disruption

Estabilização de taludes - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

Landslides cut off traffic

Estabilização de taludes - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

TECCO G45/2 mesh, in conjunction with nails, stabilizes the structure according to the dimensions specified

Estabilização de taludes - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

A coco revegetation mat is laid under the TECCO to keep the fine soil particles until the surface vegetation recovers

Estabilização de taludes - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

The hydro mulching operation is meticulously carried out to guarantee vegetation recovery

 
 

Ano de instalação

2024

Situação inicial

The railroad line 500 000 arrives in the Bordeaux urban area at Lormont and enters underground at the northern end of the Ramade tunnel. Before this tunnel’s entrance, the profile is excavated, with up to 15 meters high embankments. These embankments are made up of silt and sandy clay, generating landslides and repeatedly cutting the tracks.

Descrição

TECCO was chosen as the optimum solution for this stabilization work. Dimensioning during the execution phase made optimizing the facing with a TECCO G45/2 possible, which greatly facilitated installation rates with a maximum cost/quality ratio for this project. The hydro mulching operation allowed the stabilization solution to be ideally finalized.

País / Região

França

Promotor

SNCF Réseau

Empreteiro

SNCF Réseau

Contratante

COFEX Géotechnique

Outras empresas envolvidas

CAN

Objecto protegido

Caminho de ferro

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Project Manager Sales Eastern Switzerland

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail