Proteção contra desprendimentos - Gomshall 2025

Train passing by - protected by a rockfall barrier

Proteção contra desprendimentos - Gomshall 2025

Rockfall barrier, height is 2 metres. length 48 metres

Proteção contra desprendimentos - Gomshall 2025

Final installation, the protection barrier runs along the rail tracks

 

Sistemas

 

Comprimento do sistema

48 m

 

Ano de instalação

2025

Situação inicial

Due to recent slope instability and minor rockfall affecting the rail line near Gomshall, the engineering firm Tony Gee and Partners designed a slope and rockfall mitigation strategy.

This formed the second phase on the southern side of the cutting, with an active slope stabilisation on the northern side of the line completed in 2023. 

Due to the slope profile above this section of track and existing trees, an active nailed solution, as was used elsewhere on site, was not possible. As a result, a passive rockfall protection system (a rockfall barrier) was chosen. 

Descrição

Part of the solution for this rockfall hazard was the design and installation of a GBE-100A-R rockfall barrier, which was 2 metres high and 48 metres long, adjacent to the tracks. This system was chosen to remove the need to drill up-slope anchors for the fence and therefore minimise the time needed to install on-site. 

Due to unknown and potentially problematic ground conditions, anchoring for the fence was uncertain. It was decided that, rather than using wire rope anchors, flexheads and bar anchors in combination were the best option in case anchors had to be drilled deeper than expected.

TRAC Engineering installed the fence over several weeks with on-site assistance from Geobrugg during the build process. Once finished, Geobrugg undertook a final inspection of the completed installation. 

País / Região

Reino Unido

Promotor

Empreteiro

Contratante

Objecto protegido

Caminho de ferro

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Country Manager Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Country Manager Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Country Manager Southern Switzerland

E-mail