Estados Unidos
Estados Unidos

myGeobrugg

Proteção contra correntes de detritos - Glen Eyrie 2013

View of UX/VX debris barrier looking upstream from below

Proteção contra correntes de detritos - Glen Eyrie 2013

Access road built to the right side of the UX/VX debris barrier for easy clean out

Proteção contra correntes de detritos - Glen Eyrie 2013

View from behind UX /VX debris barrier looking downstream

Proteção contra correntes de detritos - Glen Eyrie 2013

Notable-Scour-of-channel-bed-shotcrete

Proteção contra correntes de detritos - Glen Eyrie 2013

Lower barrier, where VX and UX meet. The VX barrier is almost full. Also shows UX nets over top of VX nets

 

Comprimento do sistema

12 m - 25 m

 

Ano de instalação

2013

Situação inicial

The Waldo Canyon Fire burned approximately 18,200 acres in the summer of 2012. A significant portion of the upper watershed of Queen's Canyon was located within the burn scar of the Waldo Canyon Fire. The Glen Eyrie Castle and Conference Center are located at the mouth of The Queen's Canyon, exposing the Conference Center to post-wildfire debris flows.

Descrição

A total of 3 Geobrugg debris flow barriers, 2 UX barriers (UX120-H6 and UX180-H6) and one VX barrier ( VX080-H4) were installed at the project site. The VX barrier was installed directly below the UX180-H6. A reinforced earth berm was also constructed at this site to create a narrower channel as well as an access road that would later be used for barrier clean out.

The UX120-H6 barrier is planned to be left in place and once filled, be used as a check dam, while the VX080-H4 and UX180 H-6 have since been cleaned out a handful of times using the constructed access road.

Promotor

The Navigators

Contratante

Midwest Rockfall, Inc.

Objecto protegido

Edifício, Infra-estrutura turística, Infra-estrutura, Outros

Empreteiro

Kane GeoTech

O seu contacto local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Estados Unidos Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Estados Unidos Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Estados Unidos Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Estados Unidos Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Riscos naturais
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Riscos naturais
Geobrugg North America, LLC,Salem OR 97302 / Estados Unidos Sales Director

E-mail