Suíça
Suíça

myGeobrugg

Estabilização de taludes - Festung Hohentwiel - Singen 2020

Final inspection of the stabilized rockface (photo: LGRB)

Estabilização de taludes - Festung Hohentwiel - Singen 2020

TECCO® mesh G65/3 below the "Oberburg" (photo: LGRB)

Estabilização de taludes - Festung Hohentwiel - Singen 2020

Stabilized rock face with mesh and spike plates (photo: LGRB)

Estabilização de taludes - Festung Hohentwiel - Singen 2020

The system proves its effectiveness especially in uneven terrain - the net adapts to the ground (photo: LGRB)

Estabilização de taludes - Festung Hohentwiel - Singen 2020

Overall view: below the upper castle above the walking path (photo: LGRB)

 
 

Ano de instalação

2020

Situação inicial

Hohentwiel Fortress is a former fortress on the volcanic headland of Hohentwiel in Hegau, near Lake Constance. The rocks of the phonolite vent tower 260 meters above the town of Singen, located at the eastern foot of the mountain. With an area of nine hectares, the fortress, accessible to visitors, is the largest castle ruin in Germany. Over 80,000 people visit the site every year.

Geologia

Geologically, the Hohentwiel lies in a unit that encompasses the Hegau and western Lake Constance. Sedimentation formed the various layers of the surrounding area. Volcanic activity in the region began with the formation of the Alps. A remnant of this is the massive chimney of the original Hohentwiel, filled with deck tuff. On its eastern rim, the phonolite rises as another volcanic testimony.

Descrição

Above the visitors' path between the arsenal (fortress above) and the service building (below), 190 m² of TECCO® System G65/3 with P66 spike plates were installed using GEWI-32 and titanium 40/16 nails.

Contratante

Objecto protegido

Edifício, Infra-estrutura turística, Área residencial, Outros

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail