Suíça
Suíça

myGeobrugg

El Florido - Los Ranchos. Km 36.1

Estabilização de taludes - El Florido - Los Ranchos. Km 36.1 2019

Overview slope with TECCO® GREEN - fixing the spike plates

Estabilização de taludes - El Florido - Los Ranchos. Km 36.1 2019

Installation of stabilizing slope with anti-erosion mat

Estabilização de taludes - El Florido - Los Ranchos. Km 36.1 2019

Overview slope with TECCO® GREEN

 

Ano de instalação

2019

Situação inicial

After a massive landslide had interrupted the traffic, the slope cut was terraced. However, its stability still was insufficient.

Geologia

A layer of soil at the top and weathered rock at the bottom.

Descrição

The Consulter decided stabilize the slope using TECCO GREEN G65-3 system with nails of  nails L=12 m on bottom middle of slope (critical area).

Promotor

BCIE

Contratante

Gabriel Couto

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

ACI

Outras empresas envolvidas

ICA Inversiones

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail