Cacheuta Tunnel - Mendoza - Road N°82

Proteção contra desprendimentos - Cacheuta Tunnel - Mendoza - Road N°82 2020

General view of the stabilized slope: TECCO® G65/3 system and the 4 meters high dynamic barrier RXE-500

Proteção contra desprendimentos - Cacheuta Tunnel - Mendoza - Road N°82 2020

Drilling for the anchors (3.5 meters deep holes)

Proteção contra desprendimentos - Cacheuta Tunnel - Mendoza - Road N°82 2020

Installing the mesh at the prepared slope

Proteção contra desprendimentos - Cacheuta Tunnel - Mendoza - Road N°82 2020

In this section Rolled Cable Net QUAROX® and DELTAX® are installed

Proteção contra desprendimentos - Cacheuta Tunnel - Mendoza - Road N°82 2020

TECCO® system stabilizing the rockface

Proteção contra desprendimentos - Cacheuta Tunnel - Mendoza - Road N°82 2020

Assembly of the 4 meters high and 52 meters long rockfall barrier RXE-500

Proteção contra desprendimentos - Cacheuta Tunnel - Mendoza - Road N°82 2020

Completed RXE-500 rockfall barrier

Proteção contra desprendimentos - Cacheuta Tunnel - Mendoza - Road N°82 2020

View up the rockface - RXE-500 rockfall barrier

Proteção contra desprendimentos - Cacheuta Tunnel - Mendoza - Road N°82 2020

Debris flow protection ring net VX060L, 4 meters high, 10 meters long

 

Comprimento do sistema

10 m - 52 m

 

Ano de instalação

2020

Situação inicial

In a section of Route 82, near the entrance of the Cacheuta tunnel N°1, rocks frequently fell on the road. These and landslides represented a danger for the traffic.

Descrição

Several systems of protection against rockfall and debris flow, as well as slope stabilization, were implemented.

Installed systems per section:
1a)  RXE-500: 4 meters high and 31 meters long
1b)  VX-060L: 4 meters high and 10 meters long
2)  RXE-500: 4 meters high and 24 meters long
3)  RXE-500 :4 meters high and 42 meters long

4)  972 m² Rolled Cable Net QUAROX® Plus DELTAX®
     774 m² TECCO® G65/3 grid 2x2
     847 m² DELTAX® G80/2

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Outras aplicações instaladas

Proteção contra desprendimentos, Estabilização de taludes, Proteção contra correntes de detritos

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail