Suíça
Suíça

myGeobrugg

Estabilização de taludes - Bridger Coal Mine 2004

Protective mesh installed on the rockface slope

Estabilização de taludes - Bridger Coal Mine 2004

Installation of TECCO® G65/3

Estabilização de taludes - Bridger Coal Mine 2004

Installed TECCO®

Estabilização de taludes - Bridger Coal Mine 2004

Mesh covering the rock

 
 

Ano de instalação

2004

Situação inicial

At this open pit mine, tunnel portals were put to go underground to follow coal seams. These tunnel portals are located at the bottom of a high wall.

Descrição

The high wall was draped with TECCO® System mesh to protect personnel and equipment during construction and operation of the portals.

Promotor

Private

Contratante

Yenter Companies

Objecto protegido

Pedreira/ Minas

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

Seegmiller International

Outras aplicações instaladas

Mineração / Túneis

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail