Idioma
Portuguêspt
Estados Unidos
myGeobrugg

Registo

Não iniciou sessão, gostaria de registar-se?

Na qualidade de utilizador registado de myGeobrugg você tem acesso ampliado aos downloads, às nossas ferramentas de dimensionamento e aos nossos eventos.

Registe-se agora
A company of the BRUGG Group
Estados Unidos
Bludenz-Unterstein 2015 - Geobrugg Bludenz-Unterstein 2015 - Geobrugg
Bludenz-Unterstein 2015 - Geobrugg Bludenz-Unterstein 2015 - Geobrugg
Bludenz-Unterstein 2015 - Geobrugg Bludenz-Unterstein 2015 - Geobrugg
Bludenz-Unterstein 2015 - Geobrugg Bludenz-Unterstein 2015 - Geobrugg
Bludenz-Unterstein 2015 - Geobrugg Bludenz-Unterstein 2015 - Geobrugg
Bludenz-Unterstein 2015 - Geobrugg Bludenz-Unterstein 2015 - Geobrugg
Bludenz-Unterstein 2015 - Geobrugg Bludenz-Unterstein 2015 - Geobrugg
Bludenz-Unterstein 2015 - Geobrugg Bludenz-Unterstein 2015 - Geobrugg
Bludenz-Unterstein 2015 - Geobrugg Bludenz-Unterstein 2015 - Geobrugg
Bludenz-Unterstein 2015 - Geobrugg Bludenz-Unterstein 2015 - Geobrugg

Bludenz-Unterstein

   Compartilhar
Rua
Untersteinstrasse
Código postal
6700
Lugar
Bludenz
País / Região
Áustria
Ano de instalação
2015
Cliente
die.wildbach Wildbach- u Lawinenverbauung
Objecto protegido
Edifício
Sistemas
RXE-500, RXE-1000
Absorção de energia máxima
500 kJ, 1000 kJ
Altura do sistema
4.0 m, 5.0 m
Comprimento do sistema
40 m - 80 m
Situação inicial

Four buildings on Untersteinstrasse in Bludenz were endangered by an overhanging rock. The steep slope with a gradient of up to 150 percent had to be secured by our rockfall protection system.

Descrição

Two RXE rockfall protection barriers were installed: The first system is a RXE-1000 (5 meters in height, 40 meters in length), the second system is a RXE-1000 (5 meters in height, 44 meters in length), in combination with a RXE-500 (4 meters in height, 36 meters in length). The installation on the rough terrain was a challenge: Even a helicopter was required to transport the 300 kilogram posts up in the air. Two men received the posts, while two colleagues attached them to the ground plates – practically with one foot in the abyss. It really took them only 30 minutes to place and install the posts. The Geobrugg systems are flexibly used even on slopes that are difficult to access, they are installed quickly and easily – an efficient solution no matter how tricky the situation is.

O seu contacto local

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Riscos naturais
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / Estados Unidos
Telefone +1 860 377 3230

Formulário de contacto

Saleh Feidi
Saleh Feidi
Regional Manager California
Riscos naturais
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / Estados Unidos
Telefone +1 909 706 8964

Formulário de contacto

John Kalejta
John Kalejta
Regional Manager Central US
Riscos naturais
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / Estados Unidos
Telefone +1 505 220 1404

Formulário de contacto

Bob Lyne
Bob Lyne
Regional Manager Southeast
Riscos naturais
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / Estados Unidos
Telefone +1 336 337 0945

Formulário de contacto

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Riscos naturais
Geobrugg North America, LLC
22 Centro Algodones
Telefone +1 505 771 4080
Telemóvel +1 505 400 0796

Formulário de contacto

Tim Shevlin
Tim Shevlin
Sales Director
Riscos naturais
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / Estados Unidos
Telefone +1 503 423 7258

Formulário de contacto