瑞士
瑞士

myGeobrugg

Embase Culimo - Tilama, CBI route D-875

边坡稳定 - Embase Culimo - Tilama, CBI route D-875 2020

DELTAX® drape protecting CBI route D 875

边坡稳定 - Embase Culimo - Tilama, CBI route D-875 2020

Slope no. 2 with DELTAX® mesh

边坡稳定 - Embase Culimo - Tilama, CBI route D-875 2020

Protected road along the reservoir

边坡稳定 - Embase Culimo - Tilama, CBI route D-875 2020

T3 clips connecting the panels

边坡稳定 - Embase Culimo - Tilama, CBI route D-875 2020

View down on the protected road

 

安装年份

2020

情况

Route D-875 connects Quilimari with Tilama. A road development led to multiple cuts in rock along the Culimo reservoir. These cuts and subsequent rockfall and instabilities resulted in a security threat for users of the road.

描述

To protect drivers, the Ministry of Public Works (MOP) chose a curtain mesh system to protect areas of higher risk of rockfall. DELTAX® drape was installed in seven sectors.

国家/地区

智利

客户

MOP Coquimbo

承包商

Maserco SA

防护对象

Road

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Project Manager Sales Eastern Switzerland

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址