myGeobrugg
2013
To protect from rockfall on an alpine trail at the mountain Grossglockner in Austria, a new rockfall gallery was built between two tunnels.
The damping system ROCKFALL-X G was used on top of the gallery to economically dampen rockfall impacts with a calculated energy of up to 800 kJ. For this purpose 85 bags of the 1.3 m high damping modules were prepared in Geobrugg factory and delivered directly to the construction site.
Grossglockner Hochalpenstrassen AG
Ingenieurbüro Tschernutter Consulting GmbH
Felbermayr Bau GmbH
Road
GEOBRUGG SUPERCOATING