瑞士
瑞士

myGeobrugg

边坡稳定 - Portal Fusca 2013

Final stabilization

边坡稳定 - Portal Fusca 2013

Both systems: TECCO® (upper section) and GREENAX® (lower section)

边坡稳定 - Portal Fusca 2013

Greening process

边坡稳定 - Portal Fusca 2013

Front view of the slope

 

安装年份

2013

情况

The customer wanted an environmentally friendly and cost-efficient solution to protect the access road to the homes.

描述

In the Portal del Fusca condominium, over 3'000 m² are protected by two kinds of meshes: TECCO® G65/3 in the very critical areas with falling blocks and GREENAX® drape in the sectors with superficial erosion.

国家/地区

哥伦比亚

客户

Private

工程

Geocing S.A.S.

防护对象

Road, Residential area

腐蚀保护

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

本地联系方式

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士

联系地址