瑞士
瑞士

myGeobrugg

Tramway du Mont Blanc - Nid d'Aigle

落石防护 - Tramway du Mont Blanc - Nid d'Aigle 2022

Canopy system protecting the railway

落石防护 - Tramway du Mont Blanc - Nid d'Aigle 2022

Vue latérale de l'ouvrage

 

系统

 

系统长度

70 m

 

安装年份

2022

情况

At the tunnel entrance, just before the Nid d'Aigle arrival station, the Mont Blanc Tramway passes the foot of a cliff subject to rock falls. 

描述

The installation of a CANOPY deflector structure (self-cleaning up to 500 kJ) on a 70 meters long line, in addition to a wire mesh placed on the lower part of the rockface, allowed to secure the site.

国家/地区

法国

承包商

防护对象

Railway

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址