Amerika Birleşik Devletleri
Amerika Birleşik Devletleri

myGeobrugg

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Overview of the construction site showing the importance for the protection measures

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Fatal accident in the Valley of Tempe, main trigger for the further installed measures

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Another rockfall accident in the Valley of Tempe

Kaya düşmesine karşı koruma - Valley of Tempe 2010

SPIDER®-System installation on the rockface directly next to the road

Kaya düşmesine karşı koruma - Valley of Tempe 2010

SPIDER®-System installation on the rockface directly next to the road. Rockface is actively stabilized

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Road protected with RX-300 rockfall barrier (for 3000 kJ) and below road destroyed by rockfall

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Road protected with RX-300 rockfall barrier (for 3000 kJ) - below visible road reconstruction works

Kaya düşmesine karşı koruma - Valley of Tempe 2010

RX-300 rockfall barrier (for 3000 kJ) installation works

Kaya düşmesine karşı koruma - Valley of Tempe 2010

Road view just after all works implementation

 

Sistem uzunluğu

50 m - 300 m

 

Kurulum Yılı

2010

Durum

Témpi (also Tembi / Tembe / Τέμπη) Valley is the last remaining bottleneck along the Athens - Thessaloniki Motorway.  20,000 cars  pass by the eight kilometer long gorge each day. After two consecutive fatal rockfall events, the Agean Motorway SA closed the road in agreement with the ministry of street.

Açıklama

Olympia Joint Venture signed a contract with Geobrugg to execute emergency rockfall mitigation measures with the aim to re-open the road for two weeks during Easter time. The remaing part of the work was to be completed by the end of May 2010.  In order to meet the deadline, 30 workers, six boomlifts, two truck cranes, six compressors and a helicopter were necessary.

Dangerous rock slopes were actively stabilized using TECCO® SYSTEM³ and SPIDER®.  A series of rockfall barriers were installed along the road.

Müşteri

Olympia Joint Venture (Aktor – Hochtief)

Yüklenici

Olympia Joint Venture (Aktor - Hochtief)

Gösterilen obje

Road

Korozyon koruması

Galvanized, GEOBRUGG SUPERCOATING

Mühendislik

Omikron Kappa Consulting S.A.

Alt yüklenici

Crestageo AG, Geobrugg Italia Srl, Geobrugg Ibérica & Morocco S.A.U.

Yerel yetkiliniz

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Amerika Birleşik Devletleri Regional Manager Northeast

e-posta

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Amerika Birleşik Devletleri Regional Manager California

e-posta

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Amerika Birleşik Devletleri Regional Manager Central US

e-posta

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Amerika Birleşik Devletleri Regional Manager Southeast

e-posta

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

e-posta

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / Amerika Birleşik Devletleri Sales Director

e-posta