İsviçre
İsviçre

myGeobrugg

Şev ve Yamaç koruma - Franschhoek Pass 2014

Franschhoek Pass slope stabilization showing TECCO® SYSTEM3 and TECMAT® (two kinds of spike plates: P33/40 and P66/50).

Şev ve Yamaç koruma - Franschhoek Pass 2014

Franschhoek Pass slope stabilization showing TECCO® SYSTEM3 and TECMAT® (two kinds of spike plates: P33/40 and P66/50).

Şev ve Yamaç koruma - Franschhoek Pass 2014

Franschhoek Pass slope failure prevention showing TECCO® SYSTEM3 and TECMAT® (two kinds of spike plates: P33/40 and P66/50). Additionally visible drainage of the slope.

 

Kurulum Yılı

2014

Durum

During the latter half of 2013, the region had unseasonably high rainfall which led to several slope instability cases along the route. The majority of instabilities occurred as rock falls and superficial slides. The project was seen as an emergency work to develop a timely solution to the problem to ensure the pass could remain open to traffic while not compromising safety. Furthermore, in keeping with the heritage of the route and the surrounding environment, aesthetically pleasing and environmentally friendly solutions were required.

Jeoloji

Sedimentary rocks, highly folded. It falls under the Malmesbury Group of rocks and consists of pale-weathering massive quartzites, subgreywacke, conglomerate, dark slate and phyllite. The soil consists of 18-24% clay. The site consists predominantly ML (acc. USCS) materials.

Açıklama

A key feature of the solution was to significantly improve surface and underground drainage. Geobrugg's RUVOLUM® software was used to ensure the correct system materials/products were chosen and that these effectively integrated with the overall geotechnical solution. A combination of TECCO® System and TECMAT® erosion control material was used to cover the area.

Müşteri

Western Cape Deptartment of Transport and Public Works

Yüklenici

Penny Farthing

Gösterilen obje

Road

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

SMEC South Africa

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta