Швейцария
Швейцария

myGeobrugg

Селевые потоки и микросели - Log Barrier Spirit Lake 2017

Completed Log Barrier with Geobrugg VX060 over rigid steel structure over looking Spirit Lake, WA

Селевые потоки и микросели - Log Barrier Spirit Lake 2017

Existing inlet/outlet structure

Селевые потоки и микросели - Log Barrier Spirit Lake 2017

Log jam to be mitigated at existing inlet/outlet structure

Селевые потоки и микросели - Log Barrier Spirit Lake 2017

Channel sides where ring net and rigid log - debris barrier is to be anchored.

Селевые потоки и микросели - Log Barrier Spirit Lake 2017

Submerged logs to be mitigated

 

Системы

 

Длина системы

15 m - 13 m

 

Год установки

2017

Ситуация

Spirit Lake is a lake north of Mount St. Helens in Washington State. The lake was a popular tourist destination for many years until the 1980 eruption of Mount St. Helens. Prior to 1980, Spirit Lake consisted of two arms that occupied what had been the valleys of the North Fork Toutle River and a tributary. About 4,000 years ago, these valleys were blocked by lahars and pyroclastic flow deposits from Mount St. Helens to form the pre-1980 Spirit Lake.  (Wikipedia, 11/2017). 

During the 1980 eruption of Mount St. Helens, Spirit Lake received the full impact of the lateral blast from the volcano. The eruption tore thousands of trees from the surrounding hillsides and swept them into Spirit Lake. These thousands of shattered trees formed a floating log raft on the lake surface that covered about 40 % of the lake’s surface after the eruption. (Wikipedia, 11/2017). 

The water level of Spirit Lake is maintained at about 3,406 ft (1,040 m) by draining water through a gravity-feed tunnel completed in 1985. Had the lake level not been stabilized, the dam, which was composed of volcanic avalanche debris created by the 1980 eruption, would have been breached and caused catastrophic flooding within the Toutle River Valley.  (Wikipedia, 11/2017). 

The Spirit Lake Outlet Tunnel Intake Channel was improved and updated with a new log barrier. The purpose of the barrier is to protect and prevent clogging of the inlet structure, used to regulate the height of the lake, from floating wood debris (timbers, etc.). The timbers, which are very abundant above and below the surface of the water, constantly move by wind action and cannot be permanently
removed from the lake because the area is designated as a National Volcanic Monument (Project RFP).  

Описание

The new log barriers consist of a rigid steel debris barrier from elevation and a flexible ring net barrier installed on top for increased capacity. The existing intake channel is a 40 feet deep rock channel which is approximately 16 feet wide at the bottom. The sides of the channel are roughly at a 2V to 1H slope up the height of the channel. The barrier system is situated in the lower 30’ feet of the channel. The log barrier will be a tiered system consisting of two parts:

1) The lower 20 feet is a rigid steel frame barrier.
2) The upper 10 feet of the barrier is a Ring Net Barrier System designed by Kane Geoetch, Inc. and supplied Geobrugg North America, LLC.

The Geobrugg Ring Net Log barrier is a VX060L system. The system is has a top width of 52 feet, bottom width of 42 ft, and height 11 ft.

Страна / Регион

США

Клиент

US Army Core of Engineers

Проектировщик

Kane Geotech, Inc

Подрядчик

Amec Foster Wheeler

Защищаемый объект

Инфраструктура

Защита от коррозии

GEOBRUGG SUPERCOATING

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Western Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Western Switzerland

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ Project Manager Sales Eastern and Central Switzerland

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Monitoring
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Инженерная защита
Гидротехника
Геобругг АГ,Aachstrasse 11,8590 Romanshorn / Швейцария , Msc. Env. Eng.

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Швейцария Country Manager Southern Switzerland

Электронная почта