Eastside Catchments Gibraltar

Sir Herbert Miles Road, GX11 1AA, Gibraltar, Великобритания
2017
Клиент
Government Of Gibraltar
Проектировщик
Golder Associates
Подрядчик
CAN Geotechnical Ltd.
Защищаемый объект
Дорога, Туристическая инфраструктура, Жилой район, Инфраструктура
Энергия удара
5000 кДж
Высота системы
7.0м
Длина системы
88 m
Защита от коррозии
Оцинковка, GEOBRUGG SUPERCOATING
Ситуация

Following rockfall in 2015 Golder Associates undertook a design for rockfall mitigation measures to protect the road and residential properties below. The detailed rockfall analysis showed a requirement for protection from a 5000 kJ impact with a system height of 7 m.

Описание

In December 2016 CAN Geotechnical were awarded the project to complete phase 1 of the works, a 40 m long and 7 m high 5000 kJ rockfall barrier. We supplied a RXE-5000 barrier. To enable future works to be completed more easily and without deconstructing the existing fence, we provided a solution for the end post to alllow for this.

Over several years and many projects Geobrugg has worked with both Golders Associates and CAN Geotechncial and a good relationship has developed.  This enabled all of the involved parties to work together to find a cost effective and buildable solution. 

The ground conditions on the eastside catchments are well known and extremly difficut to work within. To enable the works to be completed CAN Geotechnical had to carry out lots of temporary works and to use enlarged concrete bases for the fence posts.  Additionally CAN Geotechnical opted to terminate all ground anchors into reinforced concrete bases with wire rope eyes protruding for connection to Geobrugg U-brakes.

In Januray 2018 CAN returned to site to instal the remaining 48m of barrier.  The customised solution installed on the previous section worked perfectly enabling a smooth instalation and transition between the two barriers.

For this phase of works CAN built upon their knowledge of the ground conditions encountered last time and in conjunction with the designer were able to use a more conventional anchoring solution avoiding the need for the large concrete foundations beams and the temporary soil nailing required in the previous phase. This was no easy task however as it required drilling with a 115mm bit to install R51 Hollow bar, with the requirement to install permanent casing in the upper part to provide extra stability.

Представитель в Вашем регионе

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Инженерная защита, берегоукрепление
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / США
Saleh Feidi
Saleh Feidi
Regional Manager California
Инженерная защита, берегоукрепление
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / США
John Kalejta
John Kalejta
Regional Manager Central US
Инженерная защита, берегоукрепление
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / США
Bob Lyne
Bob Lyne
Regional Manager Southeast
Инженерная защита, берегоукрепление
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / США
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Инженерная защита
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
Инженерная защита
Geobrugg North America, LLC
Salem OR 97302 / США